BG | EN

COMPLETED PROJECT

Luda Yana dam and water treatment plant

Panagyurishte municipality • infrastructure site

PROJECT INFORMATION
SECTOR
Public buildings & infrastructure
LOCATION
Panagyurishte municipality
STATUS
Completed
ABOUT THE PROJECT

Overview

The Luda Yana dam above Panagyurishte is one of the newest completed dams in Bulgaria, with a total volume of 20 million cu.m and a 50-metre-high dam wall. The complex includes the dam wall with its associated facilities, a drinking water treatment plant, pumping stations, water mains to the high and low zones and a service building.

The facility provides drinking water for over 40,000 people in Panagyurishte and seven settlements in the municipality. The use permit was issued in December 2025.

SCOPE OF WORKS

Our scope

water treatment plant
administrative buildings
associated infrastructure
SCADA system delivery
power electrical installations
switchboards and automation
video surveillance
access control
computer communication networks
DELIVERY CONDITIONS

Site specifics

OUR APPROACH

How we work

One team takes the site through every stage – from preparation and procurement to installation, testing and handover with full documentation.

PROJECT AT A GLANCE

The site in numbers

20 mln

cu.m volume

50

metres dam height

40 000+

residents served

BGN 56.3 mln

project value

Have a similar project?

Let us discuss your requirements and the right technical solution.